Hooks By Feleolibe

2Pack G80 Chain Hook 5/16" Logging Chain Choker Hook with 2 Tons /4400Lbs Working Load Limit for Loging Forest Clevis C Hook - Product Features
  • Chain Hook Size: G80 5/16\" Logging Chain Choker Hook (Pack of 2)
  • Bearing Load: 2 Tons Working Load Limit
  • Material:Forged from high-strength and high-toughness special alloy steel, after heat treatment.
  • Package contains: Each hook comes with 2 pins, Not installed
  • Additional: For use with standard 80 grade chain, e.g. with 8mm chain
 
5Ton Slip Hooks Swivel Lifting Hook with Safety Latch,360 Degree Alloy Steel Rotating Self-Locking Grab Hook Heavy Duty for 5Ton Working Load Limit Chain Hook for Lifting Port Transportation and More - Product Features
  • Swivel Eye Hook with Latch: Selected steel, alloy steel swive
  • 360 Degree Rotating Hook For positioning devices, rotating under heavy loads
  • Load Limit Capability:Alloy Steel Swivel with 5Ton Working Load Limiting Capability
  • Usage: Load 5 tons,slip grab chian hook with latch, safety clip device, mainly used for factory lifting, port transportation, construction engineering, equipment displacement.
  • Attention: When hoisting, make sure the connection method is correct, try hoisting before hoisting, and hoisting can only be carried out after the test hoisting is successful. During the hoisting process, it is required to be stable, and overloading is strictly prohibited.
 
2Pack 1Ton Slip Hooks Swivel Lifting Hook with Safety Latch,360 Degree Alloy Steel Rotating Self-Locking Grab Hook Heavy Duty for 1Ton Working Load Limit Chain Hook for Lifting Port Transportation - Product Features
  • Swivel Eye Hook with Latch: Selected steel, alloy steel swive
  • 360 Degree Rotating Hook For positioning devices, rotating under heavy loads
  • Load Limit Capability:Alloy Steel Swivel with 1 Ton Working Load Limiting Capability
  • Usage: Load 1ton, slip grab chian hook with latch, safety clip device, mainly used for factory lifting, port transportation, construction engineering, equipment displacement.
  • Attention: When hoisting, make sure the connection method is correct, try hoisting before hoisting, and hoisting can only be carried out after the test hoisting is successful. During the hoisting process, it is required to be stable, and overloading is strictly prohibited.
 


Facebook Twitter Instagram LinkedIn
© 2018 - BuyBestBrands.in All Rights Reserved